Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 4 results ...
Abraham, D (2011) Development of a true-cost concept for renewal of municipal underground pipeline systems, Unpublished PhD Thesis, , The University of Texas at Arlington.
Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns, Unpublished PhD Thesis, , The University of Texas at Arlington.
Florius, N A (2021) Decision tool for prioritizing bridge repair or replacement, Unpublished PhD Thesis, , The University of Texas at Arlington.
Kim, S (2023) Disaster management and recovery: Estimating the disaster impacts on construction costs and evaluating the policy effects on disaster recovery, Unpublished PhD Thesis, , The University of Texas at Arlington.